The Lurker Lounge Forums
Engineering (300) Diploma Mill - Printable Version

+- The Lurker Lounge Forums (https://www.lurkerlounge.com/forums)
+-- Forum: Lurker Games (https://www.lurkerlounge.com/forums/forum-6.html)
+--- Forum: World of Warcraft (https://www.lurkerlounge.com/forums/forum-16.html)
+--- Thread: Engineering (300) Diploma Mill (/thread-6111.html)



Engineering (300) Diploma Mill - Metrocube - 07-05-2005

1. You will need to budget $10.00 - $11.00 to buy engineering schematics ($30.00 if you are interested in crafting thorium shells).

2. You will need the following materials:
Rough Stone (100), Heavy Stone (40), Solid Stone (140), Dense Stone (90)

Copper Bar (160), Bronze Bar (120), Silver Bar (5), Gold Bar (5), Iron Bar (15), Mithril Bar (140), Thorium Bar (120 or 180; lesser amount if you have Schematic: Thorium Shells)

Weak Flux (75), Coal (4); from engineering or blacksmith supplies vendor


3. You can buy the Schematic Thorium Shells at the Auction House for about $20.00

4. Save all your crafted materials, because you will use them to create higher level items later on.

5. You cannot skill up past 75, 150, and 225 engineering without paying the engineering trainer for access to the next crafter level. Purchase your next engineering level before attempting to craft beyond these levels.

Engineering Range: Schematic (# created); New Materials Required

0 - 40: Rough Blasting Powders (x83); 83 Rough Stone
41 - 50: Handful of Copper Bolts (x10); 20 Copper Bar

JOURNEYMAN ENGINEER
50 - 51: Arclight Spanner (x1); 6 Copper Bar
52 - 60: Handful of Copper Bolts (x22); 44 Copper Bar
61 - 95: Copper Tubes (x45); 90 Copper Bar, 45 Weak Flux


96 - 100: Silver Contacts (x5); 5 Silver Bar
101 - 105: Practice Locks (x5); 5 Bronze Bar, 5 Weak Flux
106 - 130: Bronze Tubes (x25); 50 Bronze Bar, 25 Weak Flux

EXPERT ENGINEER
131 - 147: Heavy Blasting Powders (x38); 38 Heavy Stone
148 - 165: Big Bronze Bombs (x19); 57 Bronze Bar
166 - 169: Gold Power Cores (x5); 5 Gold Bar
170 - 175: Gyrochronatoms (x5); 5 Iron Bar
175 - 176: Gyromatic Micro-Adjuster (x1); 4 Iron Bar, 4 Coal
176 - 190: Solid Blasting Powders (x32); 64 Solid Stone
191 - 193: Gyrochronatoms (x5); 5 Iron Bar
194 - 195: Solid Blasting Powders (x36); 72 Solid Stone
196 - 201: Mithril Tubes (x6); 24 Mithril Bar

ARTISAN ENGINEERING
202 - 224: Unstable Trigger (x32); 32 Mithril Bar, 32 Mageweave Cloth
225 - 235: Hi-Impact Mithril Slugs (x12); 12 Mithril Bar
236 - 242: Mithril Casings (x22); 66 Mithril Bar
243 - 250: Hi-Explosive Bombs (x11); no new materials required
251 - 260: Dense Blasting Powders (x43); 86 Dense Stone
261 - 285: Thorium Widgets (x27); 81 Thorium Bar, 27 Runecloth
286 - 300: Thorium Shells (x15); 30 Thorium Bar
or
286 - 300: Thorium Tube (x15); 90 Thorium Bar


Engineering (300) Diploma Mill - Sir_Die_alot - 07-05-2005

Don't forget to work in the actual engineering items in there somewhere. Got to make the target dummys for fused wiring, unless you want to shop the auction house for it. :)


Engineering (300) Diploma Mill - Metrocube - 07-05-2005

Right. If there's anything you want to make, make them while they are rated orange or yellow. If you're paying the material cost, you may as well also get a skill up. Then, resume following the skill-up template.


Engineering (300) Diploma Mill - Brista - 07-05-2005

Why are costs given in dollars?


Engineering (300) Diploma Mill - Metrocube - 07-05-2005

Brista,Jul 5 2005, 06:19 AM Wrote:Why are costs given in dollars?
[right][snapback]82438[/snapback][/right]

Because there isn't a currency symbol for WoW gold. :-)


Engineering (300) Diploma Mill - Brista - 07-05-2005

Metrocube,Jul 5 2005, 04:45 PM Wrote:Because there isn't a currency symbol for WoW gold. :-)
[right][snapback]82454[/snapback][/right]

This one surely: £

Just joking, no I was puzzled as to whether there was some real money valuation scheme I didn't know about. I guess there probably is a site where real world prices are given for game items

Part of my puzzlement is that 20g for Thorium Shells is way out of line with what I've seen - it starts at 100g on my server


Engineering (300) Diploma Mill - Mak - 07-13-2005

thx a lot, it is just what i needed;p Actually u dont need much to lvl eng, smithing is waaaay harder (not considering mithril order quest) gg;p